The architect’s surface — Code Compliance, Studio QA/QC, drawing production, and the architect-side coordination conversations with structural, MEP, and consultants. The catalogue entries below carry the architect’s vocabulary — model audit, code review, permit-ready CDs, family classification, worksharing hygiene.
91 catalogue entries: 18 agents · 42 use-cases · 16 integrations · 10 regulations · 5 resources.
Project Timeline Drift watches the live project schedule in Primavera P6, Microsoft Project, or Asta Powerproject against the contracted baseline, then ties each slipped activity to…
Pre-sales drawing production turns a concept brief and a reference project library into a pitch-ready drawing set — site plan, typical floor plans, elevation, key sections…
IFC Round-trip Validation checks that GUIDs, geometry, and standard buildingSMART Property Sets survive an IFC round-trip between tools such as Revit, ArchiCAD, Tekla, Solibri, and Bentley…
IBC Egress Check Revit runs a means-of-egress review on the live Revit model against International Building Code Chapter 10, covering occupant load, exit access travel distance,…
Grasshopper Facade to Revit translates a Grasshopper-defined parametric facade and its Rhino .3dm preview into documentation-ready Revit curtain panels with type catalogues and a parameter-driven panel…
Estidama Pearl Rating Check runs a Revit-side review of Abu Dhabi projects against the Estidama Pearl Rating System, scoring credits across Integrated Development Process, Natural Systems,…
Passive House PHPP Verification runs a Revit-side check that the modelled geometry, fabric specifications, and openings match the Passive House Planning Package entries used for Passivhaus…
Electrical Detailed Design Autodraft places HV and LV assets—transformers, switchgear, distribution boards, cable runs, and lighting circuits—onto the architect’s washed-base DWG against the firm’s standard asset…
Dubai Building Code Compliance runs a Revit-side review of high-rise, commercial, and mixed-use submissions to Dubai Municipality, covering setbacks, heights, FAR, fire egress, parking, MEP shafts,…
Dispute Evidence Timeline assembles a chronological evidence record from the full project archive — emails, meeting minutes, RFIs, model revisions, and contract notices — for delay…